Differences

This shows you the differences between the selected revision and the current version of the page.

people:mahoneej 2019/10/29 12:45 people:mahoneej 2020/05/19 11:18 current
Line 24: Line 24:
\\ \\
**Publications** **Publications**
 +  *  Eric Mahoney, Jessica Kun, Marek Smieja, Qiyin Fang, "Review—Point-of-Care Urinalysis with Emerging Sensing and Imaging Technologies," Journal of Electrochemical Society, 167(3): 037518, 2020, doi.org/10.1149/2.0182003JES ([[http://jes.ecsdl.org/content/167/3/037518.abstract|Open Access]])
  * Eric Mahoney, Huan-Huan Hsu, Fei Du, Bo Xiong, P. Ravi Selvaganapathy, and Qiyin Fang, "Optofluidic Dissolved Oxygen Sensing With Sensitivity Enhancement Through Multiple Reflections," IEEE Sensors Journal. 19(22), 10452-10460 (2019), doi.org/10.1109/JSEN.2019.2932414 ([[https://doi.org/10.1109/JSEN.2019.2932414|online]])   * Eric Mahoney, Huan-Huan Hsu, Fei Du, Bo Xiong, P. Ravi Selvaganapathy, and Qiyin Fang, "Optofluidic Dissolved Oxygen Sensing With Sensitivity Enhancement Through Multiple Reflections," IEEE Sensors Journal. 19(22), 10452-10460 (2019), doi.org/10.1109/JSEN.2019.2932414 ([[https://doi.org/10.1109/JSEN.2019.2932414|online]])
**Accepted Papers** **Accepted Papers**
- 
-**Current Manuscripts** 
  *Mahoney E, Kun J, Fang Q. "Development of Point of Care Diagnostics in Urinalysis: A Review"   *Mahoney E, Kun J, Fang Q. "Development of Point of Care Diagnostics in Urinalysis: A Review"
  *Mahoney E, Fang Q. "Optical Simulation of Total Internal Reflection in Multilayered Fluorescence Sensors"   *Mahoney E, Fang Q. "Optical Simulation of Total Internal Reflection in Multilayered Fluorescence Sensors"
 +
 +**Current Manuscripts**
 +  *Mahoney E, Xiong B, Fang Q. "Zemax Simulation of TIR Sensitivity Enhancement"
 +  *Mahoney E, Selvaganapathy P. Ravi,  Fang Q. "Optofluidic Ammonia Sensing"
   
Line 67: Line 70:
---- ----
^  Time          ^  Monday  ^  Tuesday  ^  Wednesday  ^  Thursday  ^  Friday  ^ ^  Time          ^  Monday  ^  Tuesday  ^  Wednesday  ^  Thursday  ^  Friday  ^
-|  7:30 - 8:30  |               |               |             |             |                 |+|  7:30 - 8:30  | Setup        | Setup        | Setup      | Setup        | Setup          |
|  8:30 - 9:30  |              |              |            |              |                | |  8:30 - 9:30  |              |              |            |              |                |
|  9:30 - 10:30  |              |              |            |              |                | |  9:30 - 10:30  |              |              |            |              |                |
Line 73: Line 76:
| 11:30 - 12:30  |              |              |            |              |                | | 11:30 - 12:30  |              |              |            |              |                |
| 12:30 - 13:30  |              |              |            |              |                | | 12:30 - 13:30  |              |              |            |              |                |
-| 13:30 - 14:30  |              |              |            |             |                | +| 13:30 - 14:30  |              |              |            | Lab Meeting  |                | 
-| 14:30 - 15:30  |              |              |            |             |                | +| 14:30 - 15:30  |              |              |            | Lab Meeting  |                |
| 15:30 - 16:30  |              |              |            |              |                | | 15:30 - 16:30  |              |              |            |              |                |
-| 16:30 - 17:30  |               |               |             |             |                 |+| 16:30 - 17:30  | Shutdown      | Shutdown      | Shutdown    | Shutdown    | Shutdown        |
| 18:00 - 19:00  |              |              |            |              |                | | 18:00 - 19:00  |              |              |            |              |                |
Current Plans: Current Plans:
-  *1/2 Day Zemax Model Manuscript revisions +  *1 Day Zemax Model Manuscript revisions 
-  *2.5 Day - 3.5 Day Ammonia Sensor Development+  *1 Day - 2 Day Ammonia Sensor Development 
 +  *1 Day - 2 Day Thesis Planning and Writing
  *1/2 Day Meetings   *1/2 Day Meetings
  *1/2 Day Other (Planning, Coord, Admin)   *1/2 Day Other (Planning, Coord, Admin)
-Winter Term Plans: 
-(Term 2: Full time TA 133 Hours as well, TA placement and schedule still not available) 
-  *3 Day Ammonia Sensor Development 
-  *1 Day Thesis Preparation 
-  *1/2 Day Meetings 
-  *1/2 Day Other (Planning, Coord, Admin) 
   
==== Safety Training ==== ==== Safety Training ====
Line 109: Line 107:
^Course^Date^Exp^Course^Date^Exp^ ^Course^Date^Exp^Course^Date^Exp^
|  WHMIS core          |    05/2014  | NA      | Slips, Trips, Falls          |    06/2015  | NA      | |  WHMIS core          |    05/2014  | NA      | Slips, Trips, Falls          |    06/2015  | NA      |
-|  Biosafety Level II  |    09/2018 | 09/2019 | Asbestos Awareness          |    05/2014  | NA      |+|  Biosafety Level II  |    10/2019 | 10/2020 | Asbestos Awareness          |    05/2014  | NA      |
|  Fire Safety        |    09/2018  | 09/2020 | Ergonomics                  |    05/2014  | NA      | |  Fire Safety        |    09/2018  | 09/2020 | Ergonomics                  |    05/2014  | NA      |
|  Hazards Assessment  |    01/2014  | NA      | Chemical Handling and Spills |    10/2019  | 10/2022 | |  Hazards Assessment  |    01/2014  | NA      | Chemical Handling and Spills |    10/2019  | 10/2022 |
Line 130: Line 128:
  * Races - Pure Stock - 87 CRX - 5E   * Races - Pure Stock - 87 CRX - 5E
  * Races - Pure Stock - 87 CRX - 24   * Races - Pure Stock - 87 CRX - 24
- 
- 

Navigation
Personal Tools