Trace:
Differences
This shows you the differences between the selected revision and the current version of the page.
| people:mahoneej 2019/10/29 12:45 | people:mahoneej 2020/05/19 11:18 current | ||
|---|---|---|---|
| Line 24: | Line 24: | ||
| \\ | \\ | ||
| **Publications** | **Publications** | ||
| + | * Eric Mahoney, Jessica Kun, Marek Smieja, Qiyin Fang, "Review—Point-of-Care Urinalysis with Emerging Sensing and Imaging Technologies," Journal of Electrochemical Society, 167(3): 037518, 2020, doi.org/10.1149/2.0182003JES ([[http://jes.ecsdl.org/content/167/3/037518.abstract|Open Access]]) | ||
| * Eric Mahoney, Huan-Huan Hsu, Fei Du, Bo Xiong, P. Ravi Selvaganapathy, and Qiyin Fang, "Optofluidic Dissolved Oxygen Sensing With Sensitivity Enhancement Through Multiple Reflections," IEEE Sensors Journal. 19(22), 10452-10460 (2019), doi.org/10.1109/JSEN.2019.2932414 ([[https://doi.org/10.1109/JSEN.2019.2932414|online]]) | * Eric Mahoney, Huan-Huan Hsu, Fei Du, Bo Xiong, P. Ravi Selvaganapathy, and Qiyin Fang, "Optofluidic Dissolved Oxygen Sensing With Sensitivity Enhancement Through Multiple Reflections," IEEE Sensors Journal. 19(22), 10452-10460 (2019), doi.org/10.1109/JSEN.2019.2932414 ([[https://doi.org/10.1109/JSEN.2019.2932414|online]]) | ||
| **Accepted Papers** | **Accepted Papers** | ||
| - | |||
| - | **Current Manuscripts** | ||
| *Mahoney E, Kun J, Fang Q. "Development of Point of Care Diagnostics in Urinalysis: A Review" | *Mahoney E, Kun J, Fang Q. "Development of Point of Care Diagnostics in Urinalysis: A Review" | ||
| *Mahoney E, Fang Q. "Optical Simulation of Total Internal Reflection in Multilayered Fluorescence Sensors" | *Mahoney E, Fang Q. "Optical Simulation of Total Internal Reflection in Multilayered Fluorescence Sensors" | ||
| + | |||
| + | **Current Manuscripts** | ||
| + | *Mahoney E, Xiong B, Fang Q. "Zemax Simulation of TIR Sensitivity Enhancement" | ||
| + | *Mahoney E, Selvaganapathy P. Ravi, Fang Q. "Optofluidic Ammonia Sensing" | ||
| Line 67: | Line 70: | ||
| ---- | ---- | ||
| ^ Time ^ Monday ^ Tuesday ^ Wednesday ^ Thursday ^ Friday ^ | ^ Time ^ Monday ^ Tuesday ^ Wednesday ^ Thursday ^ Friday ^ | ||
| - | | 7:30 - 8:30 | | | | | | | + | | 7:30 - 8:30 | Setup | Setup | Setup | Setup | Setup | |
| | 8:30 - 9:30 | | | | | | | | 8:30 - 9:30 | | | | | | | ||
| | 9:30 - 10:30 | | | | | | | | 9:30 - 10:30 | | | | | | | ||
| Line 73: | Line 76: | ||
| | 11:30 - 12:30 | | | | | | | | 11:30 - 12:30 | | | | | | | ||
| | 12:30 - 13:30 | | | | | | | | 12:30 - 13:30 | | | | | | | ||
| - | | 13:30 - 14:30 | | | | | | | + | | 13:30 - 14:30 | | | | Lab Meeting | | |
| - | | 14:30 - 15:30 | | | | | | | + | | 14:30 - 15:30 | | | | Lab Meeting | | |
| | 15:30 - 16:30 | | | | | | | | 15:30 - 16:30 | | | | | | | ||
| - | | 16:30 - 17:30 | | | | | | | + | | 16:30 - 17:30 | Shutdown | Shutdown | Shutdown | Shutdown | Shutdown | |
| | 18:00 - 19:00 | | | | | | | | 18:00 - 19:00 | | | | | | | ||
| Current Plans: | Current Plans: | ||
| - | *1/2 Day Zemax Model Manuscript revisions | + | *1 Day Zemax Model Manuscript revisions |
| - | *2.5 Day - 3.5 Day Ammonia Sensor Development | + | *1 Day - 2 Day Ammonia Sensor Development |
| + | *1 Day - 2 Day Thesis Planning and Writing | ||
| *1/2 Day Meetings | *1/2 Day Meetings | ||
| *1/2 Day Other (Planning, Coord, Admin) | *1/2 Day Other (Planning, Coord, Admin) | ||
| - | Winter Term Plans: | ||
| - | (Term 2: Full time TA 133 Hours as well, TA placement and schedule still not available) | ||
| - | *3 Day Ammonia Sensor Development | ||
| - | *1 Day Thesis Preparation | ||
| - | *1/2 Day Meetings | ||
| - | *1/2 Day Other (Planning, Coord, Admin) | ||
| ==== Safety Training ==== | ==== Safety Training ==== | ||
| Line 109: | Line 107: | ||
| ^Course^Date^Exp^Course^Date^Exp^ | ^Course^Date^Exp^Course^Date^Exp^ | ||
| | WHMIS core | 05/2014 | NA | Slips, Trips, Falls | 06/2015 | NA | | | WHMIS core | 05/2014 | NA | Slips, Trips, Falls | 06/2015 | NA | | ||
| - | | Biosafety Level II | 09/2018 | 09/2019 | Asbestos Awareness | 05/2014 | NA | | + | | Biosafety Level II | 10/2019 | 10/2020 | Asbestos Awareness | 05/2014 | NA | |
| | Fire Safety | 09/2018 | 09/2020 | Ergonomics | 05/2014 | NA | | | Fire Safety | 09/2018 | 09/2020 | Ergonomics | 05/2014 | NA | | ||
| | Hazards Assessment | 01/2014 | NA | Chemical Handling and Spills | 10/2019 | 10/2022 | | | Hazards Assessment | 01/2014 | NA | Chemical Handling and Spills | 10/2019 | 10/2022 | | ||
| Line 130: | Line 128: | ||
| * Races - Pure Stock - 87 CRX - 5E | * Races - Pure Stock - 87 CRX - 5E | ||
| * Races - Pure Stock - 87 CRX - 24 | * Races - Pure Stock - 87 CRX - 24 | ||
| - | |||
| - | |||