Trace:
Differences
This shows you the differences between the selected revision and the current version of the page.
people:mahoneej 2019/09/16 08:10 | people:mahoneej 2020/05/19 11:18 current | ||
---|---|---|---|
Line 23: | Line 23: | ||
Indoor Localization and Monitoring\\ | Indoor Localization and Monitoring\\ | ||
\\ | \\ | ||
+ | **Publications** | ||
+ | * Eric Mahoney, Jessica Kun, Marek Smieja, Qiyin Fang, "Review—Point-of-Care Urinalysis with Emerging Sensing and Imaging Technologies," Journal of Electrochemical Society, 167(3): 037518, 2020, doi.org/10.1149/2.0182003JES ([[http://jes.ecsdl.org/content/167/3/037518.abstract|Open Access]]) | ||
+ | * Eric Mahoney, Huan-Huan Hsu, Fei Du, Bo Xiong, P. Ravi Selvaganapathy, and Qiyin Fang, "Optofluidic Dissolved Oxygen Sensing With Sensitivity Enhancement Through Multiple Reflections," IEEE Sensors Journal. 19(22), 10452-10460 (2019), doi.org/10.1109/JSEN.2019.2932414 ([[https://doi.org/10.1109/JSEN.2019.2932414|online]]) | ||
**Accepted Papers** | **Accepted Papers** | ||
- | * Mahoney E, Hsu HH, Du F, Xiong B, Selvaganapathy PR, Fang Q. "Optofluidic dissolved Oxygen sensing with sensitivity enhancement through multiple reflections". IEEE Sensors Journal. 2019 Aug 2. | ||
- | |||
- | **Current Manuscripts** | ||
*Mahoney E, Kun J, Fang Q. "Development of Point of Care Diagnostics in Urinalysis: A Review" | *Mahoney E, Kun J, Fang Q. "Development of Point of Care Diagnostics in Urinalysis: A Review" | ||
*Mahoney E, Fang Q. "Optical Simulation of Total Internal Reflection in Multilayered Fluorescence Sensors" | *Mahoney E, Fang Q. "Optical Simulation of Total Internal Reflection in Multilayered Fluorescence Sensors" | ||
+ | |||
+ | **Current Manuscripts** | ||
+ | *Mahoney E, Xiong B, Fang Q. "Zemax Simulation of TIR Sensitivity Enhancement" | ||
+ | *Mahoney E, Selvaganapathy P. Ravi, Fang Q. "Optofluidic Ammonia Sensing" | ||
+ | |||
**Conference Poster Presentations** | **Conference Poster Presentations** | ||
Line 59: | Line 64: | ||
* OMISS (Old Man International Sideband Society) - Since 2017 | * OMISS (Old Man International Sideband Society) - Since 2017 | ||
* Burlington Amateur Radio Club - Since 2016 | * Burlington Amateur Radio Club - Since 2016 | ||
- | * McMaster Student Chapter of SPIE - VP Quadcopter Project | + | * McMaster Student Chapter of SPIE - Graduate Advisor - Since 2015 |
* Golden Key International Honour Society | * Golden Key International Honour Society | ||
Line 65: | Line 70: | ||
---- | ---- | ||
^ Time ^ Monday ^ Tuesday ^ Wednesday ^ Thursday ^ Friday ^ | ^ Time ^ Monday ^ Tuesday ^ Wednesday ^ Thursday ^ Friday ^ | ||
- | | 7:30 - 8:30 | | | | | | | + | | 7:30 - 8:30 | Setup | Setup | Setup | Setup | Setup | |
| 8:30 - 9:30 | | | | | | | | 8:30 - 9:30 | | | | | | | ||
| 9:30 - 10:30 | | | | | | | | 9:30 - 10:30 | | | | | | | ||
Line 71: | Line 76: | ||
| 11:30 - 12:30 | | | | | | | | 11:30 - 12:30 | | | | | | | ||
| 12:30 - 13:30 | | | | | | | | 12:30 - 13:30 | | | | | | | ||
- | | 13:30 - 14:30 | | | | | | | + | | 13:30 - 14:30 | | | | Lab Meeting | | |
- | | 14:30 - 15:30 | | | | | | | + | | 14:30 - 15:30 | | | | Lab Meeting | | |
| 15:30 - 16:30 | | | | | | | | 15:30 - 16:30 | | | | | | | ||
- | | 16:30 - 17:30 | | | | | | | + | | 16:30 - 17:30 | Shutdown | Shutdown | Shutdown | Shutdown | Shutdown | |
| 18:00 - 19:00 | | | | | | | | 18:00 - 19:00 | | | | | | | ||
Current Plans: | Current Plans: | ||
- | *2 Days Urinalysis Review | + | *1 Day Zemax Model Manuscript revisions |
- | *1 Day Zemax Model Manuscript | + | *1 Day - 2 Day Ammonia Sensor Development |
- | *1 Day Ammonia Sensor Development | + | *1 Day - 2 Day Thesis Planning and Writing |
*1/2 Day Meetings | *1/2 Day Meetings | ||
*1/2 Day Other (Planning, Coord, Admin) | *1/2 Day Other (Planning, Coord, Admin) | ||
- | Plans Following Review Submission: | ||
- | *1 Day - 2 Day Zemax Model Manuscript | ||
- | *2 Day - 3 Day Ammonia Sensor Development | ||
- | *1/2 Day Meetings | ||
- | *1/2 Day Other (Planning, Coord, Admin) | ||
- | |||
- | Plans Following Model Submission: | ||
- | (Term 2: Full time TA 133 Hours as well, TA placement and schedule still not available) | ||
- | *3 Day Ammonia Sensor Development | ||
- | *1 Day Thesis Preparation | ||
- | *1/2 Day Meetings | ||
- | *1/2 Day Other (Planning, Coord, Admin) | ||
==== Safety Training ==== | ==== Safety Training ==== | ||
Line 105: | Line 98: | ||
Occasionally: | Occasionally: | ||
+ | *ABB-B105 Optics Lab | ||
*ETB-306 cleanroom | *ETB-306 cleanroom | ||
*JHE Materials Lab | *JHE Materials Lab | ||
Line 113: | Line 107: | ||
^Course^Date^Exp^Course^Date^Exp^ | ^Course^Date^Exp^Course^Date^Exp^ | ||
| WHMIS core | 05/2014 | NA | Slips, Trips, Falls | 06/2015 | NA | | | WHMIS core | 05/2014 | NA | Slips, Trips, Falls | 06/2015 | NA | | ||
- | | Biosafety Level II | 09/2018 | 09/2019 | Asbestos Awareness | 05/2014 | NA | | + | | Biosafety Level II | 10/2019 | 10/2020 | Asbestos Awareness | 05/2014 | NA | |
| Fire Safety | 09/2018 | 09/2020 | Ergonomics | 05/2014 | NA | | | Fire Safety | 09/2018 | 09/2020 | Ergonomics | 05/2014 | NA | | ||
- | | Hazards Assessment | 01/2014 | NA | Chemical Handling and Spills | 10/2016 | 10/2019 | | + | | Hazards Assessment | 01/2014 | NA | Chemical Handling and Spills | 10/2019 | 10/2022 | |
| Eng Phys/CEDT | 01/2014 | NA | Lock Out & Tag Out | 10/2016 | 10/2019 | | | Eng Phys/CEDT | 01/2014 | NA | Lock Out & Tag Out | 10/2016 | 10/2019 | | ||
| Basic Electricity | 01/2014 | NA | Academic Integrity | 01/2014 | NA | | | Basic Electricity | 01/2014 | NA | Academic Integrity | 01/2014 | NA | | ||
- | | Laser Safety (EOHSS)| 09/2018 | 09/2021 | AODA | 01/2014 | NA | | + | | Laser Safety (EOHSS)| 09/2018 | 09/2021 | AODA | 01/2014 | NA | |
| Laser Safety (add) | 01/2014 | NA | Gas Cylinder | 02/2014 | NA | | | Laser Safety (add) | 01/2014 | NA | Gas Cylinder | 02/2014 | NA | | ||
| Hydrogen Fluoride | 06/2014 | 06/2017 | Photolithography (CEDT) | 09/2014 | NA | | | Hydrogen Fluoride | 06/2014 | 06/2017 | Photolithography (CEDT) | 09/2014 | NA | | ||
| Sputtering (CEDT) | 09/2014 | NA | WHMIS Update | 12/2016 | NA | | | Sputtering (CEDT) | 09/2014 | NA | WHMIS Update | 12/2016 | NA | | ||
| SEM (ETB) | 09/2015 | NA | Ellipsometry (JHE) | 08/2015 | NA | | | SEM (ETB) | 09/2015 | NA | Ellipsometry (JHE) | 08/2015 | NA | | ||
- | | Sputtering (ETB) | 09/2015 | NA | Violence and Harrassment | 10/2016 | 10/2019 | | + | | Sputtering (ETB) | 09/2015 | NA | Violence and Harrassment | 10/2019 | 10/2022 | |
| Online Orientation | 06/2014 | NA | | | | | | Online Orientation | 06/2014 | NA | | | | | ||
+ | |||
+ | Requested Training Updates: 20191025 - Chemical Handling, Violence and Harassment, Biosafety Update | ||
==== Personal / Extracurricular ==== | ==== Personal / Extracurricular ==== | ||
Line 132: | Line 128: | ||
* Races - Pure Stock - 87 CRX - 5E | * Races - Pure Stock - 87 CRX - 5E | ||
* Races - Pure Stock - 87 CRX - 24 | * Races - Pure Stock - 87 CRX - 24 | ||
- | |||
- |