Trace: » summer_2011
Differences
This shows you the differences between the selected revision and the current version of the page.
| people:2011_summer_plans 2011/05/03 21:11 | people:2011_summer_plans 2011/05/03 21:25 current | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ===== 2011 Summer Plans ===== | ===== 2011 Summer Plans ===== | ||
| - | **Goals:** Finish FLIM project and finalized the results\\ | + | \\ |
| + | **Goal:** Finish FLIM project and finalized the results\\ | ||
| + | \\ | ||
| **Main purpose of the study:** \\ | **Main purpose of the study:** \\ | ||
| Characterizing time-lapse fluorescence lifetimes of Photofrin at different intracellular locations in order to realize if FLIM can be a potential real-time dose metric for PDT.\\ | Characterizing time-lapse fluorescence lifetimes of Photofrin at different intracellular locations in order to realize if FLIM can be a potential real-time dose metric for PDT.\\ | ||
| + | \\ | ||
| + | ---- | ||
| - | ==== May ==== | + | === May === |
| - | **5/4 - 5/10** :\\ Restart the cell culture and data analysis of (L1_1.5hr to 4 hr)\\ | + | |
| - | **5/11 - 5/17**: \\data analysis (Cells are getting happier during these two weeks)\\ | + | **5 / 4 - 5 / 10** :\\ |
| - | **5/18 - 5/24**: \\Start FLIM experiment using SP5 --\\ | + | Restart the cell culture and data analysis of (L1_1.5hr to 4 hr)\\ |
| + | \\ | ||
| + | **5 / 11 - 5 / 17** :\\ | ||
| + | Data analysis (Cells are getting happier during these two weeks)\\ | ||
| + | \\ | ||
| + | **5 / 18 - 5 / 24** :\\ | ||
| + | Start FLIM experiment using SP5 \\ | ||
| * Low concentration (5ug/ml), 1 hour of incubation (need 2 more replicates)\\ | * Low concentration (5ug/ml), 1 hour of incubation (need 2 more replicates)\\ | ||
| * Data analysis\\ | * Data analysis\\ | ||
| - | + | \\ | |
| - | **5/25 - 5/31**\\ | + | **5 / 25 - 5 / 31** :\\ |
| - | FLIM experiment (cont'd)--\\ | + | FLIM experiment (cont'd)\\ |
| * Low concentration (5ug/ml), 1.5 hr to 4 hr of incubation (need 2 more replicates)\\ | * Low concentration (5ug/ml), 1.5 hr to 4 hr of incubation (need 2 more replicates)\\ | ||
| * Data analysis\\ | * Data analysis\\ | ||
| + | \\ | ||
| + | ---- | ||
| - | + | === June === | |
| - | ==== June ==== | + | **6 / 1 - 6 / 10**:\\ |
| - | **6/1 - 6/10**:\\ | + | |
| FLIM experiment and organize all results (low concentration)\\ | FLIM experiment and organize all results (low concentration)\\ | ||
| * Low concentration (5ug/ml), 18 hr of incubation -- need 2 more replicates | * Low concentration (5ug/ml), 18 hr of incubation -- need 2 more replicates | ||
| * Data analysis\\ | * Data analysis\\ | ||
| - | + | \\ | |
| - | **6/11 - 6/30**:\\ | + | **6 / 11 - 6 / 30**:\\ |
| Organize all results using low concentration Photofrin\\ | Organize all results using low concentration Photofrin\\ | ||
| * Decide what other measurements need to be done (i.e. calibration of IRF..etc) after summarizing the results.\\ | * Decide what other measurements need to be done (i.e. calibration of IRF..etc) after summarizing the results.\\ | ||
| - | * Note: __We don't have any repetitive measurement for high concentration photofrin (20 ug/ml), not sure if it's necessary__\\ | + | * <hi #ffff00>Note: We don't have any repetitive measurement for high concentration photofrin (20 ug/ml), not sure if it's necessary</hi> \\ |
| + | \\ | ||
| + | ---- | ||
| - | ==== July ==== | + | === July === |
| - | **7/1 - 7/30**:\\ | + | **7 / 1 - 7 / 30**:\\ |
| to be arranged based on experimental results and due date\\ | to be arranged based on experimental results and due date\\ | ||
| - | * May start to finalize FLIM project, hopefully will be able to start the manuscript preparation. Angela may perform some leftover experiments.\\ | + | * May start to finalize FLIM project, hopefully will be able to start the manuscript preparation (i.e. write-up of some results and methods). Angela may perform some leftover experiments.\\ |
| + | \\ | ||
| + | ---- | ||
| - | ==== August ==== | + | === August === |
| Hopefully working on the manuscript of FLIM project. To be arranged based on the progress. \\ | Hopefully working on the manuscript of FLIM project. To be arranged based on the progress. \\ | ||
You are here: start » people » 2011_summer_plans