2011_Summer Plans_Zhaojun


Main works in summer
Finish system setup and software;
Calibrate the integrated system using the tissue phantom;
Data analysis: Correct the fluoresence signals by using the diffused reflectance signal.

May

\\5 / 4 - 5 / 15 :

     Finish the DR part; \\
     Optimize the software and system \\


5 / 16 - 5 / 23 :
Integrated system calibration:
Calibrate the TRFS system using fluorescence dye;
Make the tissue phantom for integrated system calibration

June

\\6 / 20 - 6/30:
System calibration with the tissue phantom.


July

7 / 1 - 7 / 30:
Data Analysis: Learn how to correct the fluorescence data using the diffused reflectance signal;
Literature study on optical properties;
Simulation and figure out a good algorithm and use the phantom to verify the algorithm;
Dnalyze the tissue phantom 's data and Brain data.


August

8 / 1 - 8 / 30 Write the manuscript;
Committee meeting;
Clinical study.(hopefully)