2011_Summer Plans_Zhaojun
Main works in summer
Finish system setup and software;
Calibrate the integrated system using the tissue phantom;
Data analysis: Correct the fluoresence signals by using the diffused reflectance signal.
May
\\5 / 4 - 5 / 15 :
Finish the DR part; \\ Optimize the software and system \\
5 / 16 - 5 / 23 :
Integrated system calibration:
Calibrate the TRFS system using fluorescence dye;
Make the tissue phantom for integrated system calibration
June
\\6 / 20 - 6/30:
System calibration with the tissue phantom.
July
7 / 1 - 7 / 30:
Data Analysis:
Learn how to correct the fluorescence data using the diffused reflectance signal;
Literature study on optical properties;
Simulation and figure out a good algorithm and use the phantom to verify the algorithm;
Dnalyze the tissue phantom 's data and Brain data.
August
8 / 1 - 8 / 30
Write the manuscript;
Committee meeting;
Clinical study.(hopefully)