Differences

This shows you the differences between two versions of the page.

Link to this comparison view

reusing_existing_portfolio_pages [2016/06/17 17:14]
maizlinn
reusing_existing_portfolio_pages [2018/01/25 15:36]
Line 1: Line 1:
-{{:​pebblepad:​pplogo.png?​nolink|}} 
- 
-====== Reusing Existing Portfolio Pages ====== 
-{{:​reusing_pages.jpg?​300 |}} 
- 
-When you have multiple projects, you may wish to reuse sections or pages from previous projects (such as another portfolio, blog, workbook, or pages) in another one; you can reuse parts of your projects multiple times. 
- 
-To reuse a portfolio page, open the desired page. Then, click on the “Properties” button in the top right-hand corner. A panel will slide out from the right with two subheadings:​ “Block” and “Page”. Click on the “Page” heading. 
- 
-There will be a checkbox at the bottom of the menu, under the “Reuse Pages” heading. The checkbox says “Make current page visible in your store”. This will effectively add the current page to a collection of other pages and elements (such as pictures), that you can access in different parts of PebblePad. Select the box to add the page to your store. ​ 
- 
-When you next go to create a new page by pressing on the “+” box in the top of the screen, you are prompted to “Add a new page here”. Below are the options to either “Add an existing asset” (in this case, the saved page), or to “Add an existing portfolio”. ​ 
- 
-Select the option to “Add an existing asset”. You are then provided your most recently edited assets (such as pages or workbooks) that you can reuse. Note: You can only reuse pages that you’ve saved in other projects (you cannot have duplicate pages in the original project). 
  
Print/export
QR Code
QR Code reusing_existing_portfolio_pages (generated for current page)