Differences

This shows you the differences between the selected revision and the current version of the page.

group3:group3weekly 2008/11/24 11:32 group3:group3weekly 2008/11/24 11:34 current
Line 75: Line 75:
The rest of the work on the project will work on moving the project outdoors. The challenges ahead are mounting methods for the telescope and laser, as well as power solutions for our project (since power supplies are used currently). The rest of the work on the project will work on moving the project outdoors. The challenges ahead are mounting methods for the telescope and laser, as well as power solutions for our project (since power supplies are used currently).
-Nov 24+ 
 +**Nov 24** 
 + 
In the last week, the group was experimenting with USB powering for their circuit. A Max 232 chip with capacitative voltage increasing was used to go from 5 to 9V. A second laser pointer and a NAND gate(which is part of the MAX 232 chip) were also implemented. The addition of the chip has not yet been sucessfully tested. In the last week, the group was experimenting with USB powering for their circuit. A Max 232 chip with capacitative voltage increasing was used to go from 5 to 9V. A second laser pointer and a NAND gate(which is part of the MAX 232 chip) were also implemented. The addition of the chip has not yet been sucessfully tested.

Personal Tools